thanks for the reply,
how one can setup job through windows sched. to run a job from day 1st to 14 and then 16 through (last day -1)of the month
and other job runs on 15th and last day of the month.
|
Results 1 to 4 of 4
Thread: Full BackupThreaded View
|
Click Here to Expand Forum to Full Width |