-
Oracle 10g R2 Network Import
Hi,
I am migrating a 2.6 TB 32-bit Oracle 10g R2 database to 64-bit 10g R2 using network import over a 1 Gig LAN. The import seems to be taking long (over three days). Anyone have an idea of how long it is suppose to take? I have set the Parallel parameter to 4.
Thanks
-
dont use import for that much data - just dont
use datapump, or if its the same os just move the files, imp will take forever on that much data
-
Hi,
Thanks for your reply. I am actually using data pump. I am of the opinion that I should have excluded the index.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
|
Click Here to Expand Forum to Full Width
|