DBAsupport.com Forums - Powered by vBulletin
Results 1 to 4 of 4

Thread: Check point error

  1. #1
    Join Date
    Aug 2002
    Location
    Bangalore
    Posts
    52

    Post

    Hello..

    Can any one tell me why "Check point not complete" error happens in database.


    Joe

  2. #2
    Join Date
    Jan 2002
    Location
    Netherlands
    Posts
    1,587
    if a 2nd ckpt request occurs too soon,.while the first one was busy........
    Remedy: increase the _timeout or _interval parameter.
    Tarry Singh
    I'm a JOLE(JavaOracleLinuxEnthusiast)
    TarryBlogging
    --- Everything was meant to be---

  3. #3
    Join Date
    Sep 2001
    Location
    NJ, USA
    Posts
    1,287
    Originally posted by Tarry
    if a 2nd ckpt request occurs too soon,.while the first one was busy........
    Remedy: increase the _timeout or _interval parameter.
    "Remedy: increase the _timeout or _interval parameter. ..."
    Can't solve this problem.
    U have to :
    a) increase number of redolog files.
    and/or
    b) increase size of redolog files.


  4. #4
    Join Date
    Nov 2000
    Location
    greenwich.ct.us
    Posts
    9,092
    Originally posted by Tarry
    if a 2nd ckpt request occurs too soon,.while the first one was busy........
    Remedy: increase the _timeout or _interval parameter.
    No, you either need more redo logs are bigger redo logs.
    Jeff Hunter

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


Click Here to Expand Forum to Full Width